OCI Associates, Inc. provided full electrical and information technology engineering design for the removal and new installation of fourteen flat plate baggage claim units (#1, #3, #4, #5, #7, #8, #9, #10, #23, #25, #26, #27, #28 and #32) on Level 2 of Orlando International Airport’s main terminal building. The scope of services involved the modification of and the installation of all the supporting utilities, including emergency and normal power, and the installation and relocation of the baggage claim signs and installation of the single feed conveyor security modification. The project also required the design and installation of five oversize baggage drops (one on A side and four on B side).